thaimelbournetransport.myfastforum.org Forum Index thaimelbournetransport.myfastforum.org
A great place to discuss transport issues in Melbourne and Thailand. Plus discussion from anywhere around Asia. Covers Buses, SRT, MRT, BTS, Boat, trams etc
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   Join! (free) Join! (free)
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 


New Airport raillink opening in december 2008

 
Post new topic   Reply to topic    thaimelbournetransport.myfastforum.org Forum Index -> Thailand Transport Discussion
View previous topic :: View next topic  
Author Message
admin
Site Admin


Joined: 22 Jan 2008
Posts: 127

PostPosted: Wed Apr 09, 2008 5:28 pm    Post subject: New Airport raillink opening in december 2008 Reply with quote

DAILY XPRESS
Zip to the Airport
Forget about battling through Bangkok traffic to catch your filght. From December you will be able to check in at the City Air Terminal in Makkasan and even get your boarding pass

Published on April 8, 2008


Zip to the Airport

Riding a fast Skytrain to the airport will soon be a new lifestyle for outbound travellers. The long-awaited Airport Link will be functional by this December.

Travellers will have the option of checking in their luggage at the soon-to-be-opened City Air Terminal (CAT) in the Makkasan area before boarding the rapid train to Suvarnabhumi Airport with their carry-on bags.

The CAT, 270 metres by 70 metres, has three floors where passengers can board a train as well as check in, receive a boarding pass and leave their luggage on the third floor. The luggage will be transferred to their flight. The second floor will be for arriving passengers and the first a parking lot for 200 cars.

The luggage will be transferred by Suvarnabhumi Airport Express (SA-Express) and placed in a designated coach while passengers will board other coaches on the same train.

A source says the Makkasan Station is expected to be completed by October this year.

Finishing touches

The main structure is already finished. Workers are now decorating each floor, while the modern-style roof of the station is nearly complete. Motorists on the expressways near the station can already see the attractive design of the roof.

The four rail tracks for the SA-Express and Suvarnabhumi Airport City Line and another train serving commuters are well into construction.

The tracks will allow trains to reach speeds of up to 160kph. Express journeys will take 15 minutes and commuter trips 27 minutes.

The station is part of the Airport Rail Link Project, expected to be officially opened by December.

The estimated cost of the project is Bt25.9 billion.

Engineer Banchongsak Panthong said last month that 78.5 per cent of the construction had been completed and 82 per cent of electrical and mechanical work.

By Wannapa Phetdee

Daily Xpress

XTRA

Rail link

Express Service

>> Suvarnabhumi Airport - Makkasan (City

Air Terminal -

interchange with MRT Blue Line's Phetchaburi Station)

Commuter Service

>> Suvarnabhumi Airport - Lad Krabang - Thub Chang - Hua Mark - Ramkhamhaeng - Makkasan (City Air Terminal - interchange with MRT Blue Line's Phetchaburi Station) - Ratchaprarop - Phayathai (interchange with BTS Sukhumvit Line's Phayathai Station)

http://www.nationmultimedia.com/2.../headlines/headlines_30070326.php

Back to top
View user's profile Send private message Send e-mail
Display posts from previous:   
Post new topic   Reply to topic    thaimelbournetransport.myfastforum.org Forum Index -> Thailand Transport Discussion All times are GMT + 7 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

Card File  Gallery  Forum Archive
Powered by phpBB © 2001, 2005 phpBB Group
Create your own free forum | Buy a domain to use with your forum