thaimelbournetransport.myfastforum.org Forum Index thaimelbournetransport.myfastforum.org
A great place to discuss transport issues in Melbourne and Thailand. Plus discussion from anywhere around Asia. Covers Buses, SRT, MRT, BTS, Boat, trams etc
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   Join! (free) Join! (free)
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Mildura passenger service

 
Post new topic   Reply to topic    thaimelbournetransport.myfastforum.org Forum Index -> Victorian Transport Discussion
View previous topic :: View next topic  
Author Message
Please Register and Login to this forum to stop seeing this advertsing.






Posted:     Post subject:

Back to top
admin
Site Admin


Joined: 22 Jan 2008
Posts: 173



PostPosted: Tue Jan 22, 2008 10:13 pm    Post subject: Reply with quote

All this line needs is a couple of 2 car DMU. Second hand non aircon ones will do. charge a very low fare for this line as its going to be a slower way to get to Mildura. This track can sustain a 20 to 30 kph line speed in a small DMU. If you charge only $15 to $30 per trip. People will use it as its the cheapest way. Why would someone pay 3 or 4 time more to drive the trip when they can take a slow train and save a lot of cash. Plus the train would be more fun anyway even if it takes all day to get into Melbourne. Driving on the expressway is boring and rather stressful. i much rather the train any day.

Otherwise extend the swan hill line to Mildura and build this line to 160kph standards. so the whole trip is less than 6 hours. This will be cheaper than upgrading the old line as its a much shorter section of track to build.

These are the only possiable choices for this area.
Back to top
View user's profile Send private message Send e-mail
admin
Site Admin


Joined: 22 Jan 2008
Posts: 173



PostPosted: Tue Jan 22, 2008 10:15 pm    Post subject: Reply with quote

A rail car like this is all thats needed for the mildura line





Cheap and simple with plenty of ventilation. These DMUs can take some really bad track and still keep to a timetable year in year out. they are japanese DMUs from the 1970's and 1980's
Back to top
View user's profile Send private message Send e-mail
admin
Site Admin


Joined: 22 Jan 2008
Posts: 173



PostPosted: Tue Jan 22, 2008 10:15 pm    Post subject: Reply with quote

for everyone's interest these DMUs are used on the nong khai line often with a full standing load from end to end. this line is 12 hours long and the DMUs are the same as pictured. if they can do it then mildura can do it just as well. as I doubt it would get as overcrowded as the nong khai line which runs 15 car sets of these.

Plus the average temp on the nong khai line is around 35 C in the day and 27 C at night. ie similar to the mildura line.


Back to top
View user's profile Send private message Send e-mail
Display posts from previous:   
Post new topic   Reply to topic    thaimelbournetransport.myfastforum.org Forum Index -> Victorian Transport Discussion All times are GMT + 7 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

Card File  Gallery  Forum Archive
Powered by phpBB © 2001, 2005 phpBB Group
Create your own free forum | Buy a domain to use with your forum